COMPLETED 2024
Moseley Solar
We supported both the initial construction and the post-construction phases of this solar farm. Our work included installing basin outfall pipes and structures, placing concrete cradles, and building six sediment ponds with riprap protections and spillways. After the solar arrays were installed, we returned to regrade and loosen topsoil, clean sediment basins, reclaim access roads, and prepare the site for seeding.
SERVICES: GRADING / EROSION & SEDIMENT CONTROL / STORM SEWER