COMPLETED 2023

TEMPERPACK

We built a new 15-foot-wide access road behind the facility for truck deliveries and raw product storage. Work included grading and ditching, installing 800 feet of storm drain, and relocating a section of 8-inch fire line. We also tied existing roof drains into the new storm system, prepped a new concrete entrance apron, and spread topsoil over disturbed areas.

SERVICES: EXCAVATION / GRADING / EROSION & SEDIMENT CONTROL / STORM SEWER